Send Message
Home ProductsMud Pump Spare Parts

F500-F1600 Discharge Suction Manifold For Mud Pump Fluid End

I'm Online Chat Now

F500-F1600 Discharge Suction Manifold For Mud Pump Fluid End

F500-F1600 Discharge Suction Manifold For Mud Pump Fluid End
F500-F1600 Discharge Suction Manifold For Mud Pump Fluid End F500-F1600 Discharge Suction Manifold For Mud Pump Fluid End F500-F1600 Discharge Suction Manifold For Mud Pump Fluid End

Large Image :  F500-F1600 Discharge Suction Manifold For Mud Pump Fluid End

Product Details:
Place of Origin: China
Brand Name: Topland
Certification: API
Model Number: F series Mud Pump
Payment & Shipping Terms:
Minimum Order Quantity: 1
Price: 500-3000 USD PER SET
Packaging Details: Standard Package
Delivery Time: 10~20 days
Payment Terms: T/T, L/C
Supply Ability: 1000 Set/Per Month

F500-F1600 Discharge Suction Manifold For Mud Pump Fluid End

Description
Prodcut Name: Suction Manifold And Discharge Manifold Material: American Cast Iron A487-9D
Modulation Processing: HB195-235 Type: Mud Pump Spare Parts
Key Words: Drilling Rig Mud Pump Package Application: Oilfield Mud Pump
High Light:

F1600 Discharge Suction Manifold

,

F500 Discharge Suction Manifold

,

Mud Pump Discharge Suction Manifold

F500-F1600 Discharge Suction Manifold For Mud Pump Fluid End

 

Discharge manifold Description of Mud Pump Spare Parts

Mud pump pressure medium discharge line is output. 35CrMo high quality casting blank processing. Three holes respectively, and the middle of it is connected to three hydraulic cylinders, one end and the end portion connected to the filter assembly, the output end and the other end through the four-way connection.

Discharge piping materials: American Cast Iron A487-9D, Resistant to corrosion and a wide temperature range and high strength characteristics.

PUMP TYPE DRAWING NO. ERP NO. D×L W/Kg
F500 AH35001-05.08 AH0501010507 131×1403.4 157
F800 AH34001-05.01 AH0801010501 374.7×1576 260
F1000 AH33001-05.08 AH1001010507 374.7×1674.4 276

F1300

F1600

AH36001-05.09 AH1301010509 375×1776 298

 

F500-F1600 Discharge Suction Manifold For Mud Pump Fluid End 0

Suction manifold Description of Mud Pump Spare Parts

Inhalation consists of high quality seamless steel pipe with flange machining, it is at one end of the intake air bag, and the remaining two suction side flanges are imported, the user can use the pump is installed, choose one imported injection mud or water.

 

PUMP TYPE NEW DRAWING NO. OLD DRAWING NO.
F500 AH050101-051900 AH35001-05.28.00A
F800 AH080101-050500 AH34001-05.06.00A
F1000 AH100101-052300 AH33001-05.34A.00

F1300

F1600

AH100101-052300 AH33001-05.34A.00

 

 

Related Products

F500-F1600 Discharge Suction Manifold For Mud Pump Fluid End 1

FAQ

1. Who are we?
Topland is an integrated supplier established in 2008. We are a global group of oilfield supplies with excellent teams in more than 5 countries. such as UAE, Kuwait, Iran and Saudi Arabia. We cooperated with ADES, ECDE, EDC, SOCAR-AQS,
PDL, SAKSON, ONGC etc.


2. How can we guarantee quality?
Always a double requirements and drawing checking before the production;
Always final Inspection before shipment;

3. What can you buy from us?
Drilling rig equipment and the related spares for the oil and natural gas industries. Like Rig Components, Drawworks Spare parts and Mud Pump Spare parts, Hydraulic Disc Brake,Solids Control Equipment, Drilling and Fishing Tools,Wellhead Control Equipment,Drilling Accessories, Cementing Equipment and Tools etc.

 

4. Why should you choose us?
4-1. Professional & Efficient, Customer Focus, Win-win Cooperation

4-2. Fast Quote, Competitive price & within shortest lead time

4-3. Complete Range of products, like spare parts which are interchangeable with most of the well-known OEM equipment.

4-4. Order tracking service

 

5. How is the packing?

All the packing will meet the strict export packing requirement, we surely know how important the beautiful and firm packaging to the goods.

 

6. What is your terms of payment?

A: Generally by T/T, 30% advance payment, the balance 70% payment should be paid before delivery. We support EXW, FOB, FCA, CFR, CIF, CIP, DAP, DDU and DDP INCO Terms.

Contact Details
Topland Oilfield Supplies Ltd

Contact Person: Teresa Lyu

Tel: 18700951472

Fax: 86-021-61925822

Send your inquiry directly to us (0 / 3000)