|
Product Details:
|
Product Name: | API 16C Kill And Choke Manifold | Design Pressure: | 35Mpa |
---|---|---|---|
Work Temperature: | PU(-29℃~121℃) | Material: | Carbon Steel; Stainless Steel |
Pressure: | 10000PSI | Application: | Wellhead Control |
Material Level: | EE | SPL: | SPL3 |
Highlight: | Hydraulic kill and choke manifold,wellhead pressure control equipment,API 16C kill and choke manifold |
Oilfield Wellhead Equipment API 16C Hydraulic Kill And Choke Manifold
Kill And Choke Manifold Description:
Choke manifold is a system of valves and chokes for controlling the flow from the well usually has two flow paths, one adjustable choke used primarily for cleaning the well up and facilities to install and change choke of fixed sizes for a more accurate flow control during main well flow periods.
Choke manifold is used during well testing, The positive choke has a fixed diameter and the size of the orifice on the adjustable choke can be varied. In addition the adjustable choke allows fixed chokes to be switched out as needed without stopping the well, increasing the flexibility of the overall system.
1. Application
Choke manifold is necessary device to control the well kick successfully and execute the pressure control technology on oil/gas well in the course of drilling, as it is, the device is adopted to execute new drilling-well’s technique of balance pressure, which can avoid pollution of oil-layer, improve the speed of drilling and control blowout effectively. One end of the device connects with the side flange of BOP spool. When BOP closes, it can control the finite pressure from casing by adjusting the choke valve’s opening, so balanced drilling can work under minimum pressure-difference.
2. Configuration
The choke manifold consists of choke valves, gate valves, line pipes, fittings, pressure gauges and other components.
3. Working Principles
When the pressure inside the well rises, opening/closing the choke valves (including manual chokes, hydraulic chokes and positive chokes) on the choke manifold can allow the release of the fluid inside the well so as to control casing pressure, which can be directly blown out through the gate valve if the casing pressure is quite high.
4. Pressure Ratings
The kill manifold is available in pressure ratings of 14MPa, 21MPa, 35MPa, 70MPa and 105MPa, and also can be available upon customer request.
5. Operating Instructions
(1) The working pressure of all components on the choke manifold shall be compatible with that of the BOP stack used.
(2) The choke manifold shall be installed at the place where the operator can reach it easily. The pressure test must be performed prior to installation and the seat test pressure shall be equal to the rated working pressure.
(3) The line pipe shall be level and straight as much as it could. In case of the turn of the line pipe, the 120 degree steel bent pipe shall be used. The bore of the line pipe shall be large enough.
(4) The pressure gauge must be installed.
(5) In winter, the choke manifold can work under a low temperature condition.
Kill And Choke Manifold feature of Oilfield Wellhead Equipment
• Control the well fluid flow;
• specially used for tesing in oil or gas field
• Standard two flow systems: a positive choke and an adjustable choke
• Provides a means for fluid sampling, real-time pressure and temperature monitoring, and chemical injection
• Metal-to-metal, double seal to ensure reliability in harsh environments
• 15000psi adjustable nozzle adopts gear handle,reducing the operating torque;
• Positive choke is equipped with tungsten steel lining,making it twear-resisting and corrosion resistant.
• Can be customized upon customer request
• Complies with API-6A (PSL-2,PR1), NACE MR0175)
Design Pressure | Size | Dimensions L X W X H | Configuration |
psi | inch | inch | |
5000 | 3.1/16" | 90.9 x 89.6 x 32.5 | 5 x Manual Valves |
1 x Adj.Choke & 1 x Pos. Choke | |||
1 x Data-header | |||
5000 | 3.1/16" | 90.9 x 135.7 x 41.8 | 2 x Hyd.Valves & 6 x Man. Valves |
1 x Adj.Choke & 1 x Pos. Choke | |||
1 x Data-header | |||
5000 | 4.1/16" | 76 x 108.9 x 74.0 | 4 x Manual Valves |
1 x Adj.Choke & 1 x Pos. Choke | |||
2 x Data-header & 1 x Lifting Arm on Skid | |||
10000 | 3.1/16" | 99.9 x 95.6 x 39.4 | 5 x Manual Valves |
1 x Adj.Choke & 1 x Pos. Choke | |||
1 x Data-header | |||
10000 | 4.1/16" | 108 x 178.25 x 46.0 | 8 x Manual Valves |
1 x Adj.Choke & 1 x Pos. Choke | |||
1 x Data-header | |||
10000 | 4.1/16" | 85 x 120.0 x 85.0 | 4 x Manual Valves |
1 x Adj.Choke & 1 x Pos. Choke | |||
2 x Data-header & 1 x Lifting Arm on Skid | |||
15000 | 3.1/16" | 103.5 x 161.9 x 73.1 | 4 x Hyd.Valves & 4 x Man. Valves |
1 x Hyd. Adj.Choke & 1 x Pos. Choke | |||
1 x Data-header | |||
15000 | 4.1/16" | 103.5 x 161.9 x 43.63 | 8 x Manual Valves |
1 x Adj.Choke & 1 x Pos. Choke | |||
1 x Data-header | |||
15000 | 4.1/16" | 96 x 175.0 x 72.2 | 8 x Manual Valves |
1 x Adj.Choke |
FAQ
1. Who are we?
Topland is an integrated supplier established in 2008. We are a global group of oilfield supplies with excellent teams in more than 5 countries. such as UAE, Kuwait, Iran and Saudi Arabia. We cooperated with ADES, ECDE, EDC, SOCAR-AQS, PDL, SAKSON, ONGC etc.
2. How can we guarantee quality?
Always a double requirements and drawing checking before the production;
Always final Inspection before shipment;
3. What can you buy from us?
Drilling rig equipment and the related spares for the oil and natural gas industries. Like Rig Components, Drawworks Spare parts and Mud Pump Spare parts, Hydraulic Disc Brake,Solids Control Equipment, Drilling and Fishing Tools,Wellhead Control Equipment,Drilling Accessories, Cementing Equipment and Tools etc.
4. Why should you choose us?
4-1. Professional & Efficient, Customer Focus, Win-win Cooperation
4-2. Fast Quote, Competitive price & within shortest lead time
4-3. Complete Range of products, like spare parts which are interchangeable with most of the well-known OEM equipment.
4-2. Order tracking service
5. How is the packing?
All the packing will meet the strict export packing requirement, we surely know how important the beautiful and firm packaging to the goods.
6. What is your terms of payment?
A: Generally by T/T, 30% advance payment, the balance 70% payment should be paid before delivery. We support EXW, FOB, FCA, CFR, CIF, CIP, DAP, DDU and DDP INCO Terms.
Contact Person: Zoe Zou
Tel: + 8618392113679
Fax: 86-021-61925822