Send Message
Home ProductsBOP Spare Parts

7 1/16" - 5000Psi Coiled Tubing BOP API Hydraulic Dual Ram Blowout Preventer

I'm Online Chat Now

7 1/16" - 5000Psi Coiled Tubing BOP API Hydraulic Dual Ram Blowout Preventer

7 1/16" - 5000Psi Coiled Tubing BOP API Hydraulic Dual Ram Blowout Preventer
7 1/16" - 5000Psi Coiled Tubing BOP API Hydraulic Dual Ram Blowout Preventer 7 1/16" - 5000Psi Coiled Tubing BOP API Hydraulic Dual Ram Blowout Preventer 7 1/16" - 5000Psi Coiled Tubing BOP API Hydraulic Dual Ram Blowout Preventer

Large Image :  7 1/16" - 5000Psi Coiled Tubing BOP API Hydraulic Dual Ram Blowout Preventer

Product Details:
Place of Origin: China
Brand Name: Topland
Certification: API
Model Number: Blowout Preventer
Payment & Shipping Terms:
Minimum Order Quantity: 1
Price: negotiable
Packaging Details: wooden box
Delivery Time: 15 working days
Payment Terms: L/C, Western Union, D/A, D/P
Supply Ability: 5 per day

7 1/16" - 5000Psi Coiled Tubing BOP API Hydraulic Dual Ram Blowout Preventer

Description
Applicable: Energy & Mining, Petroleum Machinery Material: Stainless Steel
Processing Type:: Forging Warranty: 1 Year
Work Pressure:: 10000Psi Color:: Customized
High Light:

Hydraulic Dual Ram Blowout Preventer

,

5000Psi Coiled Tubing BOP

,

API Dual Ram Blowout Preventer

7 1/16"-5000Psi Coiled Tubing BOP API Hydraulic Dual Ram Blowout Preventer


7 1/16"-5000Psi Hydraulic Dual Ram Blowout Preventer
The Ram BOP is consist of body, intermediate flange, bonnet, operating piston, opening piston, closing piston and ram assembly,locking housing, locking screw etc.The upper and bottom connection of the BOP are all in accordance with API SPEC 6A twenty Edition /ISO10423. The parts which will touch with the fluid are all meet NACE-MR-01 -75 anti - H2S requirements.
The Ram BOP is designed with embedded parallel oil passage way, which makes the ram change more easily. The Body, Intermediate Flange and other pressure containing parts are all using the forging material. The material performance can meet the requirements of API Spec 16A Third Edition / IS013533 and NACE MR0175. The sealing of Intermediate Flange and Body is realized by the bonnet seal. This kind of bonnet seal adopts the radial moving way, which can fulfill the good sealing even if the well pressure increase or the bonnet bolts extend. In the same time, it can also decrease the close torch of the bonnet bolts.

Main Parameter
Model
2FZ18-35
ID
7 1/16''(180mm)
Working Pressure
5000 Psi
Strength Test Pressure
7500 Psi
Max. Control Working Pressure
3000 Psi
Ram Size
Blind Ram,2 7/8'',3 1/2'',5'',7'' Ram
Connection Type
Top and Bottom Connection (R46 Gasket Ring)
Working Tempreature
T20 (-29℃~+121℃)
 
7 1/16" - 5000Psi Coiled Tubing BOP API Hydraulic Dual Ram Blowout Preventer 0

7 1/16" - 5000Psi Coiled Tubing BOP API Hydraulic Dual Ram Blowout Preventer 1

FAQ

1. Who are we?
Topland is an integrated supplier established in 2008. We are a global group of oilfield supplies with excellent teams in more than 5 countries. such as UAE, Kuwait, Iran and Saudi Arabia. We cooperated with ADES, ECDE, EDC, SOCAR-AQS, PDL, SAKSON, ONGC etc.


2. How can we guarantee quality?
Always a double requirements and drawing checking before the production;
Always final Inspection before shipment;
3. What can you buy from us?
Drilling rig equipment and the related spares for the oil and natural gas industries. Like Rig Components, Drawworks Spare parts and Mud Pump Spare parts, Hydraulic Disc Brake,Solids Control Equipment, Drilling and Fishing Tools,Wellhead Control Equipment,Drilling Accessories, Cementing Equipment and Tools etc.

 

4. Why should you choose us?
4-1. Professional & Efficient, Customer Focus, Win-win Cooperation

4-2. Fast Quote, Competitive price & within shortest lead time

4-3. Complete Range of products, like spare parts which are interchangeable with most of the well-known OEM equipment.

4-2. Order tracking service

 

5. How is the packing?

All the packing will meet the strict export packing requirement, we surely know how important the beautiful and firm packaging to the goods.

 

6. What is your terms of payment?

A: Generally by T/T, 30% advance payment, the balance 70% payment should be paid before delivery. We support EXW, FOB, FCA, CFR, CIF, CIP, DAP, DDU and DDP INCO Terms.

Contact Details
Topland Oilfield Supplies Ltd

Contact Person: Teresa Lyu

Tel: 18700951472

Fax: 86-021-61925822

Send your inquiry directly to us (0 / 3000)