Send Message
Home ProductsSolids Control Equipment

Hydrocyclone Desander For Drilling Mud Separator Solids Control Equipment

I'm Online Chat Now

Hydrocyclone Desander For Drilling Mud Separator Solids Control Equipment

Hydrocyclone Desander For Drilling Mud Separator Solids Control Equipment
Hydrocyclone Desander For Drilling Mud Separator Solids Control Equipment Hydrocyclone Desander For Drilling Mud Separator Solids Control Equipment

Large Image :  Hydrocyclone Desander For Drilling Mud Separator Solids Control Equipment

Product Details:
Place of Origin: China
Brand Name: Topland
Certification: ISO
Model Number: FX
Payment & Shipping Terms:
Minimum Order Quantity: 1
Price: 500-3000 USD PER SET
Packaging Details: Standard Package
Delivery Time: 10~20 days
Supply Ability: 50000 Sets Per Month

Hydrocyclone Desander For Drilling Mud Separator Solids Control Equipment

Description
Product Name: Hydrocyclone Material: Polyurethane
Type: Gravity Separator Weight: 3.5 Kg
Function: Separate Grading Efficiency: 80%~90%
Cone Angle: 20° Production Capacity: 0.05-900m³/h
Condition: New HS Code: 8431431000

Hydrocyclone Desander For Drilling Mud Separator Solids Control Equipment

 

Hydrocyclone description :

 

The desander can be widely applied in the triple-process of the drilling fluid and when it is used efficiently, the desanders can effectively clear the solid-phase granules with diameter of more than 30 microns in the drilling fluid. It is one indispensable device for stabilizing and adjusting the drilling fluid technical parameters, suitable for those drillers as ZJ70, ZJ50 and ZJ40. And it can be used together with the sealed circulatory system of the drilling fluid.

 

Hydrocyclone Advantages:

 

1.Simple structure; light and nimble; no moving part
2.Low maintenance charge; easy to attach and detach; save floor space; low construction expense
3.Large processing capacity
4.The classification particle size can reach 10μm

 

Solids Control Equipment Hydrocyclone Datasheet

 

Specification Diameter (mm) Inlet Pressure (MPa) Capacity (m³) Cut Size (μm)
FX25 25 0.1-0.6 0.3-0.1 5-20
FX50 50 0.1-0.4 2-5 5-40
FX75 75 0.1-0.4 5-10 10-40
FX100 100 0.1-0.3 8-20 20-50
FX150 150 0.08-0.3 14-35 20-74
FX200 200 0.06-0.3 25-40 40-100
FX300 300 0.06-0.2 45-90 50-150
FX350 350 0.06-0.2 70-160 50-150
FX400 400 0.06-0.2 100-170 74-150
FX500 500 0.04-0.2 140-240 74-200
FX610 610 0.04-0.15 200-300 74-200
FX660 660 0.04-0.15 260-450 74-220
FX710 710 0.04-0.15 500-900 74-350

 

Hydrocyclone Desander For Drilling Mud Separator Solids Control Equipment 0Hydrocyclone Desander For Drilling Mud Separator Solids Control Equipment 1

Hydrocyclone Desander For Drilling Mud Separator Solids Control Equipment 2

Hydrocyclone Desander For Drilling Mud Separator Solids Control Equipment 3

FAQ

1. Who are we?
Topland is an integrated supplier established in 2008. We are a global group of oilfield supplies with excellent teams in more than 5 countries. such as UAE, Kuwait, Iran and Saudi Arabia. We cooperated with ADES, ECDE, EDC, SOCAR-AQS, PDL, SAKSON, ONGC etc.


2. How can we guarantee quality?
Always a double requirements and drawing checking before the production;
Always final Inspection before shipment;

3. What can you buy from us?
Drilling rig equipment and the related spares for the oil and natural gas industries. Like Rig Components, Drawworks Spare parts and Mud Pump Spare parts, Hydraulic Disc Brake,Solids Control Equipment, Drilling and Fishing Tools,Wellhead Control Equipment,Drilling Accessories, Cementing Equipment and Tools etc.

 

4. Why should you choose us?
4-1. Professional & Efficient, Customer Focus, Win-win Cooperation

4-2. Fast Quote, Competitive price & within shortest lead time

4-3. Complete Range of products, like spare parts which are interchangeable with most of the well-known OEM equipment.

4-2. Order tracking service

 

5. How is the packing?

All the packing will meet the strict export packing requirement, we surely know how important the beautiful and firm packaging to the goods.

 

6. What is your terms of payment?

A: Generally by T/T, 30% advance payment, the balance 70% payment should be paid before delivery. We support EXW, FOB, FCA, CFR, CIF, CIP, DAP, DDU and DDP INCO Terms.

 

 

Contact Details
Topland Oilfield Supplies Ltd

Contact Person: Teresa Lyu

Tel: 18700951472

Fax: 86-021-61925822

Send your inquiry directly to us (0 / 3000)